1. 負(fù)責(zé)車輛動(dòng)態(tài)功能測(cè)試
2. 負(fù)責(zé)高壓電控系統(tǒng)能量管理測(cè)試
3. 整車動(dòng)力單元控制器軟件刷新
4. 整理試驗(yàn)報(bào)告
5. 分析試驗(yàn)數(shù)據(jù),并給出相應(yīng)的結(jié)果
6. 配合動(dòng)力總成臺(tái)架運(yùn)行,分析數(shù)據(jù),互相驗(yàn)證
7. 根據(jù)試驗(yàn)計(jì)劃,建立報(bào)告模板
8. 解決試驗(yàn)過程中出現(xiàn)的問題
9. 英文具備優(yōu)秀的讀寫即可
有電車背景加分, 有電車動(dòng)力總成測(cè)試背景為加大分
System Integration and Validation
(E_E Powertrain Validation)
System integration and validation is focusing on powertrain software testing in vehicle, make sure powertrain software meets test specification.
E/E Hotline and Powertrain System commissioning
Vehicle powertrain function validation and failure analysis
E/E hotline support and PSIT vehicle preparation.
Vehicle customer function validation based on test case and daily free driving test. and Failure pre-analysis, defect ticket creation and test case creation based on failure.
Required Qualifications
?Languages: Proficient level of Chinese and English in order to fully understand test cases.
?BMW Driving license (B1, B2, and E1) and High voltage qualification level (Flash 3) requested. Supplier should be responsible to arrange the training and equip their associates with correct levels.
?Established knowledge of industrial production processes
?Good team player with outstanding communication skills
?Intercultural sensibility
?Utilized structural work approach and analytical thinking skills
?Skilled for INCA, CAN analyzer, E-sys, INPA, Microsoft office and so on.